home    corporate website    site map    contact  
 
 
 
 
 
Home
 
Fugro West

Projects

Bay Area Rapid Transit (BART) - Oakland Airport Connector Project

Background

BART, the Metropolitan Transportation Commission (MTC), the City of Oakland, and the Port of Oakland plan to close the three-mile gap between the BART's Coliseum station and the Oakland Airport by constructing an Oakland Airport Connector. This $230 million project includes up to four new stations, a tunnel section, a maintenance facility and aerial and at-grade guideways.

Fugro's Role and Performance

Fugro’s scope of services included both geotechnical site characterization and analyses. The site characterization scope of work included:

• Conducting site reconnaissance

• Researching previous studies in the immediate alignment vicinity

• Obtaining permits/permissions from government agencies and private owners for field exploration access

• Exploring subsurface conditions with subsurface borings (23) and Cone Penetration Test (24) soundings

• Laboratory testing

• Developing interpretative subsurface cross sections

• Preparing geotechnical data and site characterization reports.

Aerial view of SFOBB bridge.
RTK Reference Station on Yerba Buena Island
Constructin of the east span.
Multibeam Hydrographic Survey of TBT
Loma Prieta earthquake damage.
 
Home   |   Disclaimer   |   Fugro © 2012.   |   All rights reserved.